Air Liquide and Energas operate quality systems that not only meet the requirements of ISO 9001:2015 but includes additional procedures as required by Air Liquide (Group) | |
Group instructions are issued as required to all Air Liquide subsidiaries and managed locally | |
The subsidiaries are audited as required; externally by an accredited body, internally and also by Air Liquide (Group) to ensure continuing compliance | |
All auditing is coordinated through the Chief Industrial Auditor who reports directly to the Managing Director | |
The Quality System is managed by the SHEQ Manager | |
Number of quality staff | 1 |
ISO 9001:2015 accreditation ensures ALUK has a comprehensively written Quality Manual containing systems for all of the following (n.b. this list is not exhaustive) | BSI |
Management Commitment (evidence of) | |
Management review | |
Staff training | Carried out as required |
A quality policy detailing quality objectives | |
Document control | Procedure and Process is defined and Managed |
Risk analysis | Managed by SHEQ & relevant Teams |
Resource management | Managed By Managers and HR |
Process Planning, Design and Development | New plant or products have to go be approved through a defined procedure by a qualified design authority (or similar) |
Management of change | Any non like-for-like changes to plant or equipment have to be approved through a defined process |
Verification | By relevant terms |
Validation | By relevant terms |
Purchasing | New suppliers are validated, and/or audited if/as required |
Sales | |
Customer focus | |
Inspection & testing | |
Equipment calibration | |
Equipment maintenance | |
Record control | Records are kept for the minimum period as defined by relevant regulations |
Sample retention | |
Control of non conforming product | Product recall process in place (SOP) |
Packaging, Labelling and Storage incl. Batch Labelling | Products carry a labelling process |
Distribution | Road |
Customer Satisfaction & Customer Complaints (handling of) | CS team |
Continual improvement | Team and projects in place |
Corrective actions | As required by relevant teams |
Preventive actions | As required by relevant teams |
Audits | See audit section |
HACCP systems are in place as required | |
Members of the British safety council | |